← Go back
LOCATION: | Saltillo |
---|
TYPE OF WASTE ADDRESSED: | Defects |
---|
DATE: | 04/30/2024 |
---|
NAME: | MIGUEL MORENO |
---|
DEPARTMENT: | Operations |
---|
BEFORE | |
---|
AFTER | |
---|
IMPROVEMENTS | THE TOOL GUIDE ALLOWS TO REDUCE THE SCRAP 100% ON THE SCREW ASSEMBLY PROCESS, THE COST AVOIDED IS $1.3546 EACH PIECE.
|