LOCATION: Saltillo
TYPE OF WASTE ADDRESSED: Waiting
DATE: 02/02/2025
NAME: OSCAR FLORES
DEPARTMENT: Maintenance
BEFOREBEFORE
AFTERAFTER
IMPROVEMENTS

- Reduced grinding preparation time from 10 minutes to 3 minutes per piece.
- Increased milling capacity from 5 pieces to 12 pieces per shift.
- Reduced machine stoppages from 3 per shift to 0.