NP. PAD TOWER. A robot was implemented to optimize part extraction, along with adjustments to the press opening and ejector movement. The process was switched from semi-automatic to fully automatic, eliminating human error. Additionally, the cooling time was optimized to further reduce delays. As a result, the total cycle time was reduced to 60 seconds, increasing daily production to 2880 pieces, improving efficiency by 45.02%.