LOCATION: Jeffersonville
TYPE OF WASTE ADDRESSED: Defects
DATE: 04/02/2025
NAME: Brandon Schneider
DEPARTMENT: Operations
BEFOREBEFORE
AFTERAFTER
IMPROVEMENTS

Built EOA for 4058 mold in press 22. Eliminating downtime from parts being crushed and waste of parts being lost under press that miss the chute. Once parts are smashed in tool it results in pulling the tool for repair very often. Very rarely make it through a full run without needing repair. Always hundreds of parts lost under press during run.