McPherson

LOCATION: McPherson
TYPE OF WASTE ADDRESSED: Extra Processing
DATE: 06/27/2024
NAME: Daniel Dick
DEPARTMENT: Operations
BEFOREBEFORE
AFTERAFTER
IMPROVEMENTS

We switched to %100 regrind at C01. The material with clog in the cone. The outside pressure when the material flows down the hole creates a ceiling which doesn't all material to flow. There is now in a material like in place so the material cannot clog on itself. This saves time for the material handler and helps keep cycle time.