Saltillo

LOCATION: Saltillo
TYPE OF WASTE ADDRESSED: Waiting
DATE: 12/23/2024
NAME: Gabriel Flores Almaguer
DEPARTMENT: Maintenance
BEFOREBEFORE
AFTERAFTER
IMPROVEMENTS

The modification eliminated downtime caused by the need for manual resets, ensuring continuous production without interruptions.
The improvement reduced downtime by approximately 15 minutes per hour, saving a total of 2 hours per shift. This increased machine availability and overall productivity 25%